
Manufacturing
Built, tested and documented for integrators
VEXWALL works with professional AV manufacturing partners with independent R&D, production and test capability.
Production flow
A controlled path from component to shipment

01
Component control
Incoming components are checked before they enter assembly.
02
Controlled assembly
SMT, assembly and inspection follow defined production checkpoints.
03
Signal verification
Inputs, outputs and published compatibility are checked against the specification.
Quality gates
Verification before handover
- 01Incoming component inspection
- 02Assembly and visual inspection
- 03Whole-unit aging and burn-in
- 04Input/output and signal testing
Evidence
Documentation follows the hardware
Product documentation, test information and applicable certification documents are available through the engineering and quote process. Ask for the documents relevant to your project and model.
Discuss your project requirements
Share your signal mix and application with our engineers before you specify the hardware.
